One wonder at a time
The most recent demonstrations of our expertise
Refurbishment of : 12 spillwst gates, 2 sluice gates, 12 embedded guides, stoplogs, bridge crane, monorail for Melville generating station.
Design, fabrication and installation of the powerhouse crane of 300 metric tons.
Design, fabrication and installation of two construction cranes of 30 and 35 metric ton.
Design, fabrication and installation of 18 overhead crane for a new smelter plant in Qatar.
Design, fabrication and installation of the gates, guides, stoplogs, lifting systems for Romaine-1 generating station spillway.