Since 1942
The most recent demonstrations of our expertise
Refurbishment of : 12 spillwst gates, 2 sluice gates, 12 embedded guides, stoplogs, bridge crane, monorail for Melville generating station.
Replacement of 395 meters of 1.6 meter diameter penstock.
Design, fabrication and installation of the spillway for Romaine-2 Generating station.
Design, fabrication and installation of the gates, guides, stoplogs, lifting systems for Romaine-1 generating station spillway.
Design, fabrication and installation of the Romaine-1 generating station penstocks. two penstock of 5.6 meters of diameter by 63 meters of length.