Since 1942
The most recent demonstrations of our expertise
Refurbishment of : 12 spillwst gates, 2 sluice gates, 12 embedded guides, stoplogs, bridge crane, monorail for Melville generating station.
Replacement of 395 meters of 1.6 meter diameter penstock.
Design, fabrication and installation of two construction cranes of 30 and 35 metric ton.
Design, fabrication and installation of the gates, guides, stoplogs, lifting systems for Romaine-1 generating station spillway.