One wonder at a time
The most recent demonstrations of our expertise
Refurbishment of : 12 spillwst gates, 2 sluice gates, 12 embedded guides, stoplogs, bridge crane, monorail for Melville generating station.
Design, fabrication and installation of the Romaine-1 generating station penstocks. two penstock of 5.6 meters of diameter by 63 meters of length.
Design, fabrication and installation of the powerhouse crane of 300 metric tons.
Design, fabrication and installation of two construction cranes of 30 and 35 metric ton.
Replacement of 395 meters of 1.6 meter diameter penstock.