Since 1942
The most recent demonstrations of our expertise
Refurbishment of : 12 spillwst gates, 2 sluice gates, 12 embedded guides, stoplogs, bridge crane, monorail for Melville generating station.
Design, fabrication and installation of the gates, guides, stoplogs, lifting systems for Romaine-1 generating station spillway.
Replacement of 395 meters of 1.6 meter diameter penstock.
Design, fabrication and installation of two construction cranes of 30 and 35 metric ton.