Since 1942
The most recent demonstrations of our expertise
Refurbishment of : 12 spillwst gates, 2 sluice gates, 12 embedded guides, stoplogs, bridge crane, monorail for Melville generating station.
Design, fabrication and installation of the spillway for Romaine-2 Generating station.
Replacement of 395 meters of 1.6 meter diameter penstock.
Design, fabrication and installation of the powerhouse crane of 300 metric tons.