Since 1942
The most recent demonstrations of our expertise
Refurbishment of : 12 spillwst gates, 2 sluice gates, 12 embedded guides, stoplogs, bridge crane, monorail for Melville generating station.
Replacement of 395 meters of 1.6 meter diameter penstock.
Design, fabrication and installation of 18 overhead crane for a new smelter plant in Qatar.
Design, fabrication and installation of the Romaine-1 generating station penstocks. two penstock of 5.6 meters of diameter by 63 meters of length.
Design, fabrication and installation of the powerhouse crane of 300 metric tons.