Since 1942
The most recent demonstrations of our expertise
Refurbishment of : 12 spillwst gates, 2 sluice gates, 12 embedded guides, stoplogs, bridge crane, monorail for Melville generating station.
Design, fabrication and installation of the gates, guides, stoplogs, lifting systems for Romaine-1 generating station spillway.
Design, fabrication and installation of 18 overhead crane for a new smelter plant in Qatar.
Design, fabrication and installation of the spillway for Romaine-2 Generating station.